Costa Rica Land for Sale By Owner
Costa Rica Real Estate Bilingual Services

Real Estate for Sale in Costa Rica!

Costa Rica real estate
Online Tools

 

Home Page
Costa Rica Land Sale
Costa Rica Home Sale
Costa Rica Ranch/Farm
Location of Properties
Buying Real Estate
Building In Costa Rica
Real Estate Closing Cost
Dominical Real Estate
Costa Rica Ocean View
Title Guaranty
Costa Rica Beachfront
Costa Rica Developer
Bilingual Services
Costa Rica Residency
Costa Rica Relocation
Real Estate Information
Contact Us

 

Financing Available

 

Link Directory

 

Ocean View Realty
Eduardo Penalva is a bilingual real estate agent specializing in Costa Rica real estate
Eduardo Penalva
Office (506) 786-5678

Ocean View Realty
Costa Rica Real Estate Investments and Development

Tel: (506) 786-5678  e-mail Ocean View Realty

Building in Costa Rica

By law, all applications for construction permits in Costa Rica must be filed by an architect or civil engineer who is a member of the Costa Rican Association of Engineers and Architects. These experts will review your plans to ensure the building meets seismic, electrical and other regulations standards, it is therefore advisable to contact a reputable, license architect or civil engineer to guide you through the construction process. A word of advice, we highly recommend to work with a bilingual architect or civil engineer or have your agent/interpreter with you at all meetings of construction projects.

Here are the minimum rates charged by members of the Costa Rican Association of Engineers and Architects:

The involvement of a license architect or civil engineer in a construction project is divided in two phases A-Construction plan and permits. B- Control and execution.

Construction Plan and Permits:

1- Preliminary study of construction plans and permits,: 0.5 percent  of project cost. These studies may or may not be required, depending on the project.2- Pre-project design: 1 percent to 1.5 percent of the price of the project cost. The architect or engineer and client will meet to discuss construction details and requirements.  3- Construction plans and technical specifications: 4:0 percent of project cost. Once the client and architect or civil engineer agreed with the lay out and design of the property, then the plans are drawn. In Costa Rica a complete set of plan include a site plan, distribution plan, elevation, transversal and longitude perspective, roof design, drainage, mechanical and sanitary system design, design of footings and support beams, structural plans, electrical design, , interior finishing and construction.4- Budgeting: 0.5 percent for global budgeting, 1.0 percent for itemized budgeting. He or she will provide you with a list of materials necessary for the project, and will prepare a construction budget.

Control and Execution

Construction and project supervision.

The regulation authorize three kinds of supervision:1- Inspection: 3.0 percent of total construction cost. The engineer or architect visits the site weekly to inspect and make sure that the plan is being followed by the general contractor, they verify and  informs you of the quality of materials being used, and checks the invoices submitted by the general contractor. 2- Supervision: 5.0 percent of total construction cost. Engineer or architect visits the site daily and is more directly involved with the construction.
3- Management and Administration: 12 percent of total construction cost. The architect or engineer is complete responsible for the execution and completion of the project.

Before you sign any of this contracts, be sure to have a thoroughly understanding of its contents, (i.e. fee structure, what is included in the fee, architect or civil engineer responsibilities, etc.)

Building Permit

You must get a construction permit to build a house of more than 70 sq./m. (750 sq./ft.)

The permits are file at the Permit Reception Office. The plans will be review studied by representatives from the Roads and Transportation Department, Housing and Urban Development Department, Electricity Department, Water Department, National Electrical Services, Costa Rican Architect and Engineer Association, the Health Department and the local municipality where the property is located.

You will need the following:

1. Four copies of the construction plans
2. Four copies of the property cadastre plan (plano catastrado)
3. Two copies of the property deeds
4. One copy of the architect or engineer's consulting contract (Contrato de Consultoria)
5. Approval from the water department regarding availability of water
6. One copy of your electrical design plan approved by SNE.

You will also need a construction permit from the municipality where your property is located. Each municipality creates and enforces building codes for construction project in its area.